VIKING 180T/195T SERVICE BULLETINS

***PLEASE NOTE: THE REMOVAL OF ANY GEARBOX REQUIRES A NEW CENTERING BUSHING, EVERY TIME***

If not already done, the knock sensor must be installed. Please contact Alissa for the kit if needed.

Viking 130 and Viking Turbo Valve Adjustment

Be sure to just “check” the valve lash without loosening any hardware. Nine times out of ten you don’t actually have to adjust anything.



Intercooler Mounting

Active as of 03/01/2022. Any engines sent after this date will not need to comply, as it has already been done on your engine.


MANDATORY ECU UPDATE

AS OF 08/04/2023

At Viking Aircraft Engines, we are continuously working to improve our products and engines. A recent update to the ECU provides:

  • Better Efficiency

  • Further Knock Protection

  • Improved Starting

  • Smoother Running Engine

  • Increased Protection During Higher Temperatures

This is a mandatory update for all Viking 180/195T ECU's.


MANDATORY GEARBOX UPDATE

AS OF 08/04/2023

Recent improvements to the Viking 180/195T gearbox have shown increased rigidity. The support of the internal gears has been changed from ball bearings to roller bearings which are much stronger and last longer. This change was brought into effect starting September 2022. All 2023 gearboxes are equipped with the newer and improved roller bearings. Engines with gearboxes purchased prior to September 2022 must be updated.

This update provides:

  • Increased Gear Life

  • Larger Margin of Safety

  • Provision for Increased Oil Level

  • Increased Bearing and Seal Life

  • Stronger and Longer Lasting Gearbox

This is a mandatory update for all Viking 180/195T Gearboxes.

*All upgrades are provided at cost, plus shipping and handling.


Cylinder Head Stud Kit

Heavy duty cylinder head stud kit for the Viking 195T. Converted to the Viking 195 turbo. The studs provide an additional measure of engine, rigidity and prevention for a possible head gasket leak in the future. Anyone after 7/01/2024 will need this update.