VIKING 90 ENGINE SPECIFIC
***PLEASE NOTE: THE REMOVAL OF ANY GEARBOX REQUIRES A NEW CENTERING BUSHING, EVERY TIME***
The videos provided below are a great start for the 90 HP engine installation, these should be used in conjunction with the 130 HP videos and cover in depth electrical, fuel systems and more.